Storm Water Management

Phase II Minimum Control Measures

Under the storm water program, MS4s are required to develop and implement a Storm water Pollution Prevention Program (SWPPP). The SWPPP must cover six minimum control measures:

The MS4 must identify best management practices (BMP) and measurable goals associated with each minimum control measure. An annual report on the implementation of the SWPPP must be submitted each year.

Six minimum control measures

1. Public Education and Outreach

The SWPPP activities implemented under Minimum Control Measure (MCM) 1 will focus on increasing public awareness of the harmful effects of storm water runoff and its potential to affect the water quality of the Red River in the small regulated municipal separate storm sewer systems (MS4's) metropolitan area. Services and educational information will be made available to the public to promote practices conducive to the reduction of pollution that results from storm water runoff. Outreach programs and educational activities that demonstrate the impacts of storm water discharges on the Red River will be developed and implemented within the permit term to increase the general level of understanding of the SWPPP throughout the community.

2. Public Involvement

The SWPPP activities implemented under Minimum Control Measure (MCM) 2 will focus on increasing public involvement and participation in reducing the harmful effects of storm water runoff and its potential to affect the water quality of the Red River in the Fargo-Moorhead metropolitan area. Activities that will reduce or eliminate the impacts of storm water discharges on the Red River will be developed and implemented within the permit term to increase the general level of involvement in the SWPPP throughout the community.

3. Illicit Discharge Detection and Elimination

The SWPPP activities implemented under Minimum Control Measure (MCM) 3 will focus on developing, implementing, and enforcing a program that will reduce and eliminate the impacts of illicit discharges into the storm sewer system during the permit term throughout the community.

4. Construction Site Discharge Controls

The SWPPP activities implemented under Minimum Control Measure (MCM) 4 will focus on developing, implementing, and enforcing a program that will reduce or eliminate the impacts of storm water runoff from construction activities that result in a land disturbance of greater than or equal to one acre into the storm sewer system during the permit term throughout the community.

5. Post-Construction Controls for New Development

The SWPPP activities implemented under Minimum Control Measure (MCM) 5 will focus on developing, implementing, and enforcing a program that will reduce or eliminate the impacts of storm water runoff from new development and redevelopment projects that disturb greater than or equal to one acre, including projects that are less than one acre and are part of a larger development plan, that discharge into the storm sewer system during the permit term throughout the community.

6. Good Housekeeping & Pollution Prevention

The SWPPP activities implemented under Minimum Control Measure (MCM) 6 will focus on developing, implementing, and enforcing an operations and maintenance program that will reduce or eliminate the impacts of storm water pollution from open space maintenance, snow disposal, vehicle and building maintenance, land disturbances, and storm sewer system maintenance during the permit term throughout the community.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 